Trio Series

TRIO buildings feature 9x9x9m (29x29x29 ft) equilateral A-frame truss construction. Since there are no load-bearing interior walls, you can customize the floor plan layouts with ease to suit your families needs.

Features

Trio 57
Total floor area 51,7 m2 / 556,0 ft2
Length 5,7 m /19,0 ft
Width 9,0 m /29,5 ft
Height 8,7 m /28,5 ft
Floors 2
Bedrooms 2
Bathrooms 1
Accomodates 1 - 4 people
Trio 75
Total floor area 71,5 m2 / 769,0 ft2
Length 7,5 m /24,6 ft
Width 9,0 m /29,5 ft
Height 8,7 m /28,5 ft
Floors 2
Bedrooms 2
Bathrooms 1
Accomodates 1 - 5 people
Trio 100
Total floor area 97,3 m2 / 1047,0 ft2
Length 10,0 m /32,8 ft
Width 9,0 m /29,5 ft
Height 8,7 m /28,5 ft
Floors 2
Bedrooms 3
Bathrooms 1
Accomodates 2 - 6 people
Trio 120
Total floor area 121,0 m2 / 1300,0 ft2
Length 12,0 m /39,4 ft
Width 9,0 m /29,5 ft
Height 8,7 m /28,5 ft
Floors 2
Bedrooms 4
Bathrooms 2
Accomodates 3 - 7 people
Trio 150
Total floor area 139,8 m2 / 1495,0 ft2
Length 15,0 m /49,2 ft
Width 9,0 m /29,5 ft
Height 8,7 m /28,5 ft
Floors 2
Bedrooms 4
Bathrooms 2
Accomodates 4 - 8 people

Process

01
Choose an Avrame model and acquire land. Consult your local authorities to find out what you need to do before building.
Estimated time: 2-6 weeks
Work with Avrame to customize your chosen model, then hire an architect to complete the planning application. Sign contracts with both.
Estimated time: 3-9 weeks
02
03
Avrame will produce a kit with everything you need to build your home. When it’s ready, we’ll ship it directly to the building site. Estimated time: 6-8 weeks
Hire contractors to assemble the kit and equip it with utilities Estimated time: 4-10 weeks
04
05
Add furniture and throw a housewarming party! Total time: 4-8 months

Floor Plans